Issue 142: "P69 is associated with" can be used to describe sequences of procedures
ID:
142
Starting Date:
2007-01-12
Working Group:
1
Status:
Done
Closing Date:
2007-07-10
Background:
There is a need to document separately the various stages of a process. For example if you want document the act of taking an image of a coin, you need to document first the arrangement of the lighting.
Current Proposal:
"P69 is associated with" is a candidate property to describe sequences of procedures. Is there a need to specialize into relationships describing parts of a design versus sequences of a procedure? Sequences of procedures in this sense are plans, and never factual. Factual sequences are documented as instances of "E7 Activity". To be clarified if this needs an amendment to the scope note, or if it is an FAQ
Outcome:
Introduce P69.1 has type to describe association types.
Edinburgh 10/7/2007